Apex RC Adventure Park logoAPEX RC ADVENTURE PARK

BUILDING APEX IN PUBLIC

Budget & Funding Transparency

See the Phase 1 plan, verified Apex Stripe support totals and where successful payments are designated — without exposing private bank information.

LIVE FUNDING STATUS

Checking Stripe…

The integration is deployed. The Apex Stripe secret still needs to be connected before live totals appear.

STRONG LAUNCH GOAL

$48,384

Current Phase 1 planning target.

GROSS STRIPE SUPPORT

$0

Successful Apex-tagged Stripe payments before refunds.

REFUNDS

$0

Refunded Apex-tagged Stripe payments.

NET VERIFIED SUPPORT

$0

0.0% of the Strong Launch goal.

VERIFIED ALLOCATION BY FUND

Where Stripe support is designated.

A supporter chooses the fund before checkout. That designation is stored with the Stripe payment and read back here.

No verified Apex Stripe allocations to display yet.

This area will populate automatically after the Stripe connection is active and successful Apex-tagged payments are received.

CURRENT PHASE 1 TARGET

$48,384 Strong Launch planning target

This is a planning estimate, not a claim that this amount has already been raised or committed.

$14,300

Bare Minimum
Lean test launch.

$48,384

Strong Launch
Recommended credible outdoor opening.

$99,590

Full Outdoor Pilot
Larger site/fleet/infrastructure scenario.

WHERE THE MONEY IS PLANNED TO GO

Strong Launch budget

Working assumptions will be replaced with actual quotes and signed terms as the project moves forward.

01

Site control + due diligence — $6,500

Planning allowance for deposits, zoning/use review, surveys/inspections and early site needs.

02

Site prep + outdoor attractions — $13,500

Grading/materials, first track, crawler area, barriers and activity-zone setup.

03

Rental RC fleet + power — $8,500

Starter rental cars/trucks, batteries, chargers, spares and safety setup.

04

Mobile check-in + event setup — $5,500

Trailer/check-in, tents, tables, signage, POS and event infrastructure.

05

Tools + repair capability — $2,500

Basic RC Garage tools, workbenches, diagnostics and field-repair equipment.

06

Insurance + permits + admin — $3,500

Initial insurance, licensing, permits and operating setup.

07

Marketing + launch — $2,500

Signs, local promotion, launch content and first-event materials.

08

Working capital + contingency — $5,884

Cash reserve for early operations, replacements and unexpected costs.

ONE ACCOUNT + PUBLIC PROJECT TOTALS

Simple money flow, transparent reporting.

Stripe Intake

Support is collected securely and tagged with the selected Apex fund.

Dedicated Business Account

Normal Apex money can flow into one dedicated AEUC Empire LLC business account. The public website does not expose the bank balance or account details.

Property Escrow

When a real land agreement requires earnest money, funds can move to the title-company or attorney escrow named in that agreement.

TRUST RULES

What these numbers do — and do not — mean.

Planning ≠ Raised

Targets remain clearly labeled until money actually clears.

Stripe ≠ Bank Balance

The dashboard reports Apex-tagged Stripe payments. It does not claim to show the business checking balance, Stripe fees, unrelated income or every later expense.

Refunds Count

Refunds reduce the public net-support number.

Spending Comes Next

Actual Apex spending will be added as a separate ledger so supporters can see money in, money spent and remaining project funds.